Long Drilling Auger
Long Drilling Auger

CFA Concrete Grouting Machine Tool

Features and Functions of CFA Long Auger Drill Pipe
CFA long auger drill pipe is the core component of the CFA (Continuous Flight Auger) pile drilling method. It integrates **drilling, soil discharge, and concrete delivery**, serving as key equipment for efficient, eco-friendly and continuous pile formation.
  • CFA Concrete Grouting Machine Tool

CFA-Concrete-Grouting-Machine-Tool

  1.  Features

 1.1 Structure and Material

  • – Hollow shaft: Made of high-pressure seamless alloy steel pipe, which transmits torque and acts as a concrete pumping channel.
  • – Continuous spiral flight**: Manufactured from high-wear-resistant steel with one-piece forming; scientific pitch (about 0.6–0.7 times the diameter) ensures smooth soil discharge.
  • – Reliable connection**: Plug-in threaded / flange / hexagonal connection with good sealing, fast assembly and disassembly, and high tensile strength.
  • – Complete specifications**: Commonly 400–800 mm in diameter, suitable for different pile diameters and strata.

1.2Performance Advantages

  • – High efficiency & continuity: Drilling, soil discharge and concrete pumping proceed simultaneously, with high pile-forming speed (800–100 m/day).
  • – Low disturbance & eco-friendly: No vibration, low noise, minimal impact on surrounding environment and foundations.
  • – Wide stratum adaptability: Applicable to clay, sand, silt, soft rock, and gravel layers.
  • – Controllable quality: With automatic control system, accurately controls drilling speed, lifting speed and concrete pressure, reducing pile breakage and necking.
  • – Durability & reliability: Wear-resistant flights, high-strength shaft, double-sided welding at key parts, long service life.

 

2. Main Functions

2.1 Drilling and Hole Forming

  • – Transmits torque and pressure from the drilling rig to drive the drill bit to cut soil.
  • – Rotating spiral flights lift cuttings to the surface, realizing continuous hole forming.

2.2 Concrete Delivery and Pile Formation

  • – After reaching the design depth, concrete is pumped through the **hollow shaft**.
  • – Concrete is extruded from the bottom of the drill bit while lifting the auger, filling the borehole to form a complete pile.

2.3 Ensuring Construction Quality

  • – Spiral flights slightly compact the borehole wall, improving shaft friction resistance.
  • – Continuous pumping prevents hole collapse and necking, ensuring high pile density.
  • – With monitoring system, records depth, pressure and concrete volume in real time for fullprocess control.

2.4  Improving Project Benefits

  • – Fast pile formation shortens construction period.
  • – High single-pile bearing capacity (1.5–3 times higher than ordinary piles), reducing pile quantity and material consumption.
  • – No slurry wall protection required, reducing pollution and hole cleaning procedures, lowering costs.

  1. Application Scenarios

  • – Building foundations, CFG pile composite foundations, foundation support piles.
  • – Soft soil improvement in municipal, highway, railway and water conservancy projects.
  • – Construction in urban and residential areas sensitive to vibration and noise.

CFA-Concrete-Grouting-Machine-ToolLong Drilling Auger

D P δ L(m) Kg
400 340 16 2 283
3 386
4 489
5 592
6 695
500 400 16 2 465
3 638
4 811
5 983
6 1156
600 500 20 2 526
3 730
4 933
5 1137
6 1340
800 500 20 2 671
3 948
4 1223
5 1499
6 1775
1000 500 20 2 865
3 1225
4 1592
5 1961
6 2329

Continuous Flight Auger

φ P δ1 δ2 KG
400 340 30 16 254
500 400 30 16 386
600 500 40 20 449
800 500 40 20 603
1000 500 40 20 797
project-v1-shape1
project-v1-shape2
OUR PRODUCTS

Best-selling Products

OUR LATEST

Our Latest Blog & News

Can a hydraulic pile breaker reduce pile head removal time
  • 22,October

Can a hydraulic pile breaker reduce pile head removal time?

Read how a hydraulic pile breaker changes pile head removal time, which site delays remain, and what to check before choosing a model for your project.
When Should Contractors Choose a Core Drilling Rig for Sampling
  • 15,October

When Should Contractors Choose a Core Drilling Rig for Sampling?

Looking for a core drilling rig for sampling? Explore hydraulic core drilling, diamond coring and key selection factors. Find reliable drilling solutions from SINOVO Rig. Contact us!
What Depths Can a Rotary Drilling Rig Reach
  • 9,October

What Depths Can a Rotary Drilling Rig Reach?

How deep can a rotary drilling rig drill? Compare 12–20 m compact rigs and 30–75 m foundation rigs, plus kelly bars, rock tools and site factors. Get a SINOVO drilling solution for your project.
Can a Water Well Drilling Machine Handle Sand and Rock Layers
  • 2,September

Can a Water Well Drilling Machine Handle Sand and Rock Layers?

Need a water well drilling machine for mixed sand and rock? SINOVO Rig supports mud rotary, DTH hammer, casing and drilling tool solutions for changing ground conditions.
What Makes Rotary Drilling Rigs a Smart Choice for Deep Foundations
  • 24,September

What Makes Rotary Drilling Rigs a Smart Choice for Deep Foundations?

Discover why rotary drilling rigs are ideal for deep foundations, mixed ground and large-diameter piles. Explore SINOVO rigs for demanding foundation projects.
What rotary drilling equipment improves foundation drilling output
  • 18,September

What rotary drilling equipment improves foundation drilling output?

Boost foundation drilling productivity with high-torque hydraulic rotary drilling rigs from SINOVO. Explore rigs for deep piling, hard ground, bridges, railways and low-headroom projects.
SERVICES

Services

Professional and reliable after-sales service(1)

Professional and reliable after-sales service

We provide a comprehensive and responsive after-sales service to ensure your operations run smoothly. Our support team offers 12-hour online service to address your inquiries promptly, regardless of your location worldwide. Additionally, we have our own professional after-sales engineers who can be dispatched to your site as required. Our on-site services include installation, commissioning, operator training, and pile testing, all tailored to meet your specific needs and ensure optimal performance of your equipment.    
Production-to-shipment tracking and feedback process

Production-to-shipment tracking and feedback process

We provide comprehensive, end-to-end tracking and regular updates throughout the entire process, from production initiation to final shipment. Our systematic tracking covers each critical stage: assembly, quality inspection, testing, packaging, and final loading for dispatch. At every milestone, we proactively provide detailed feedback, including photos, videos, and progress reports. This transparent communication ensures you are fully informed and can plan confidently for the seamless arrival of your equipment, eliminating uncertainty and facilitating a smooth project timeline.  
Professional pre-sales services

Professional pre-sales services

Our pre-sales service is designed to optimize your procurement process from the very beginning. By integrating the expertise of our sales personnel with our technical engineering team, we provide professional consultation based on your specific project requirements. This collaborative approach significantly reduces your upfront selection costs and improves overall efficiency. We focus on delivering precise product recommendations, ensuring the proposed equipment is the most suitable and effective solution for your project needs, ultimately helping you make a well-informed and confident purchasing decision.      

Leave A Message


    Products
    Contacts
    WhatsApp
    Email