XY-5A core drilling rig
XY-5A core drilling rig

XY-5A core drilling rig

The XY5A is suitable for multi-angle drilling and has a wider speed range. It is easy to disassemble and operate, making it ideal for mountainous terrain. Furthermore, it is upgraded with a water brake system, which has a greater lifting capacity and is easy to operate when lifting from a low position.

Model : XY-5A
Max. Drilling Depth: 1500-1800m;
Drilling diameter: BQ-NQmm
Driveing Type: Mechanical
Walking Type: Skid, Crawler, Trailer and Truck as optional
  • XY-5A core drilling rig

The XY-5A core drilling rig can be used for oblique and straight hole drilling. It has the advantages of simple and compact structure, reasonable layout, moderate weight, easy disassembly, and wide speed range. The drilling rig is equipped with a water brake, which has a large hoisting capacity and is easy to lift and operate.

Technical Features

  1. The drilling rig has multiple speed levels (8 levels) and a reasonable speed range, with high low-speed torque. Therefore, the drilling rig has strong process adaptability and a wide range of applications. It is suitable for drilling small-diameter diamond cores, as well as meeting the requirements of large-diameter hard alloy core drilling and some engineering drilling.
  2. The drilling rig is lightweight and has good disassembly. It can be disassembled into eleven components, making it easy to relocate and suitable for operations in mountainous areas.
  3. The structure is simple, the layout is reasonable, and it is easy to maintain, upkeep, and repair.
  4. The drilling rig has two reverse rotation speeds, which facilitates accident handling.
  5. The drilling rig has a low center of gravity, is firmly fixed, moves smoothly, and has good stability during high-speed drilling.
  6. The instruments are complete and convenient for observing various drilling parameters.
  7. The operation handle is centralized, easy to operate, simple and flexible.
  8. The mud pump is independently driven, with flexible power configuration and airport layout.
  9. According to user needs, circular slips can be configured to directly clamp rope drill rods for drilling, eliminating the need for active drill rods.
  10. The hydraulic system is equipped with a hand cranked oil pump. When the power machine cannot work, the hand cranked oil pump can still be used to deliver pressure oil to the inlet oil cylinder, lift the drilling tools out of the hole, and avoid drilling accidents.
  11. The winch is equipped with a water brake to ensure smooth and safe drilling during deep hole drilling.
XY-5A core drilling rig
1.Basic parameters
Drill depth 1800m(Φ42mm drill pipe)
800m(Φ73mm drill pipe)
1800m(BQ drill pipe)
1500m(NQ drill pipe)
Vertical axis rotation angle 0-360°
External dimensions(L*W*H) 3500×1300×2175mm
( Assembly of electric motor)
3700×1300×2175mm
(Assembling diesel engines)
Weight of drilling rig (excluding power) 3420kg
2.Rotator (when equipped with a 55kW, 1480r/min power machine)
Vertical shaft speed Forward to low speed 98,166,253,340r/min
Forward to High Speed 359,574,876,1244r/min
Reverse low-speed 69r/min
Reverse High Speed 238r/min
Vertical axis travel 600mm
Maximum lifting force of vertical axis 138.5kN
feeding capacity 93kN
Maximum turning torque of vertical shaft 5361N·m
Vertical shaft through-hole diameter 92mm
3.Winch (when equipped with a 55kW, 1480r/min power machine)
Maximum lifting capacity of single rope (first layer) 60kN
Wire rope diameter 18.5mm
Drum capacity rope capacity 120m
4.Vehicle moving device
Moving the oil cylinder stroke 600mm
5.hydraulic system
System set working pressure 8MPa
Gear oil pump displacement 20+16ml/r
6.Drilling rig power
model Y2-250M-4 motor YC6B135Z-D20 Diesel engine
power 55kW 84kW
speed 1480r/min 1500r/min
project-v1-shape1
project-v1-shape2
OUR PRODUCTS

Best-selling Products

OUR LATEST

Our Latest Blog & News

Can a hydraulic pile breaker reduce pile head removal time
  • 22,October

Can a hydraulic pile breaker reduce pile head removal time?

Read how a hydraulic pile breaker changes pile head removal time, which site delays remain, and what to check before choosing a model for your project.
When Should Contractors Choose a Core Drilling Rig for Sampling
  • 15,October

When Should Contractors Choose a Core Drilling Rig for Sampling?

Looking for a core drilling rig for sampling? Explore hydraulic core drilling, diamond coring and key selection factors. Find reliable drilling solutions from SINOVO Rig. Contact us!
What Depths Can a Rotary Drilling Rig Reach
  • 9,October

What Depths Can a Rotary Drilling Rig Reach?

How deep can a rotary drilling rig drill? Compare 12–20 m compact rigs and 30–75 m foundation rigs, plus kelly bars, rock tools and site factors. Get a SINOVO drilling solution for your project.
Can a Water Well Drilling Machine Handle Sand and Rock Layers
  • 2,September

Can a Water Well Drilling Machine Handle Sand and Rock Layers?

Need a water well drilling machine for mixed sand and rock? SINOVO Rig supports mud rotary, DTH hammer, casing and drilling tool solutions for changing ground conditions.
What Makes Rotary Drilling Rigs a Smart Choice for Deep Foundations
  • 24,September

What Makes Rotary Drilling Rigs a Smart Choice for Deep Foundations?

Discover why rotary drilling rigs are ideal for deep foundations, mixed ground and large-diameter piles. Explore SINOVO rigs for demanding foundation projects.
What rotary drilling equipment improves foundation drilling output
  • 18,September

What rotary drilling equipment improves foundation drilling output?

Boost foundation drilling productivity with high-torque hydraulic rotary drilling rigs from SINOVO. Explore rigs for deep piling, hard ground, bridges, railways and low-headroom projects.
SERVICES

Services

Professional and reliable after-sales service(1)

Professional and reliable after-sales service

We provide a comprehensive and responsive after-sales service to ensure your operations run smoothly. Our support team offers 12-hour online service to address your inquiries promptly, regardless of your location worldwide. Additionally, we have our own professional after-sales engineers who can be dispatched to your site as required. Our on-site services include installation, commissioning, operator training, and pile testing, all tailored to meet your specific needs and ensure optimal performance of your equipment.    
Production-to-shipment tracking and feedback process

Production-to-shipment tracking and feedback process

We provide comprehensive, end-to-end tracking and regular updates throughout the entire process, from production initiation to final shipment. Our systematic tracking covers each critical stage: assembly, quality inspection, testing, packaging, and final loading for dispatch. At every milestone, we proactively provide detailed feedback, including photos, videos, and progress reports. This transparent communication ensures you are fully informed and can plan confidently for the seamless arrival of your equipment, eliminating uncertainty and facilitating a smooth project timeline.  
Professional pre-sales services

Professional pre-sales services

Our pre-sales service is designed to optimize your procurement process from the very beginning. By integrating the expertise of our sales personnel with our technical engineering team, we provide professional consultation based on your specific project requirements. This collaborative approach significantly reduces your upfront selection costs and improves overall efficiency. We focus on delivering precise product recommendations, ensuring the proposed equipment is the most suitable and effective solution for your project needs, ultimately helping you make a well-informed and confident purchasing decision.      

Leave A Message


    Products
    Contacts
    WhatsApp
    Email